Demolition of existing water basin cooling towers, associated concrete enclosure, site work, and utilities. New Construction of Concrete Cooling Tower Enclosure, Cooling Tower Supports, associated site work, and utilities.
Author: BSCadmin
Arizona Pipe Trades Computer Lab Classroom Buildout
Role: General Contractor
Project Components: Demolition, Metal Studs, Drywall, Flooring, Acoustical Ceiling, Painting, HVAC, Electrical, Fire Alarm, Fire Sprinklers, and a Accordion Folding Partition.
Subcontractors: Bel-Aire Mechanical, Commonwealth Electric, State Tile, Davidson-Bohannon Painting, Apollo Security Group, AZ Verde Fire Protection, and Hufcor.
Main Challenge: Making the best use of the space for the computer tables and the folding partition divider wall.
Solution: Sketch ups, and coordinating the space with the entire project team.
Project Completed: 2018
Arizona State Hospital Central Plant Boiler and Controls Replacement
Role: GC
Project Components: Demolition, Excavation, Specialty Micro Piles, Mechanical, Plumbing, Electrical, Structural, Architectural, Equipment, and Controls.
Subcontractors: Bel-Aire Mechanical, Commonwealth Electric, and Phoenix Cutting Services.
Main Challenge: Soil Conditions and Equipment Lead Time.
Solution: Special Engineering, micro piles, and long lead time procurement.
Project Completed: 2016
SWHD Design Build Turn-Key Modular Building and Site Utilities
Role: Design Build Contractor
Subcontractors: Modular Solutions, Western Underground, G & S Electric, PM Plumbing and Mechanical, and S & S Paving.
Main Challenge: Utility Coordination with the City and the Monte Vista School.
Solution: Brought all parties together to achieve a common goal of keeping the project on track, on budget, and on time through scheduling and push pull activities.
Project completed: 2015
Arizona Department of Administration Chiller and Cooling Tower
Role: Specialty Subcontractor.
Project Components: Structural Concrete Screen Walls, Structural Concrete Equipment Pads, Helical Piers, Structural Steel, Metal Framing, and Standing Seam Metal Roofing.
Main Challenge: Unknown underground utilities and working in the Down Town Phoenix Area.
Solution: Potholing, coordination with the project team, special engineering, and city traffic closure permitting.
Project completed: 2014
Mercy Gilbert Hospital Parking Lot Addition
Role: General Contractor
Project Components: Site grading, paving, landscaping, lighting, storm water retention, sidewalk, curb, gutter, colored concrete, crosswalks, and detectable warning systems.
Subcontractors: Ace Asphalt, Swain Electric, and Landscape Professionals
Stetson Canal Shops, Scottsdale Project
Role: Carpentry Subcontractor
Project Components: Exposed exterior wood beams, columns and corbels
Contractor: WE O’Neil
Main Challenge: Coordination with other subcontractors: crowded site, access restrictions, and working at heights
Solution: Safe work planning and work activity pre-planning.
Mercy Gilbert Healing Garden Project
Role: General Contractor
Project Components: Site grading, landscape, hardscape, and a water feature.
Subcontractors: S & S Paving, The Landscape Broker, Casa Companies, Swain Electric
Architect: Greey Pickett.
Main Challenge: Tentative and careful budgeting.
Solution: Flexible scheduling, quality subcontractors.
Chandler Regional Medical Center Morrison Building Parking Lot Addition Project
Role: General Contractor
Project Components: Site grading, paving, landscaping, lighting, storm water retention, sidewalk, colored concrete, crosswalks, curb, gutter, and detectable warning systems
Subcontractors: ACE Asphalt, Swain Electric, Landscape Professionals
Main Challenge: Work directly in front of building in use
Solution: Courtesy, and careful redirection of vehicle and foot traffic
Waste-Water Treatment Plant Project
Role: Concrete Subcontractor
Project Components: Complex concrete structures with stairs
Contractors: University Mechanical
Main Challenge: Phasing and coordination
Solution: Full cooperation, and look ahead scheduling