Posted on

Arizona Pipe Trades Computer Lab Classroom Buildout

Role: General Contractor

Project Components: Demolition, Metal Studs, Drywall, Flooring, Acoustical Ceiling, Painting, HVAC, Electrical, Fire Alarm, Fire Sprinklers, and a Accordion Folding Partition.

Subcontractors: Bel-Aire Mechanical, Commonwealth Electric, State Tile, Davidson-Bohannon Painting, Apollo Security Group, AZ Verde Fire Protection, and Hufcor.

Main Challenge: Making the best use of the space for the computer tables and the folding partition divider wall.

Solution: Sketch ups, and coordinating the space with the entire project team.

Project Completed: 2018

Posted on

Arizona State Hospital Central Plant Boiler and Controls Replacement

Role: GC

Project Components: Demolition, Excavation, Specialty Micro Piles, Mechanical, Plumbing, Electrical, Structural, Architectural, Equipment, and Controls.

Subcontractors: Bel-Aire Mechanical, Commonwealth Electric, and Phoenix Cutting Services.

Main Challenge: Soil Conditions and Equipment Lead Time.

Solution: Special Engineering, micro piles, and long lead time procurement.

Project Completed: 2016

IMG_3479
IMG_3432

Posted on

SWHD Design Build Turn-Key Modular Building and Site Utilities

Role: Design Build Contractor

Subcontractors: Modular Solutions, Western Underground, G & S Electric, PM Plumbing and Mechanical, and S & S Paving.

Main Challenge: Utility Coordination with the City and the Monte Vista School.

Solution: Brought all parties together to achieve a common goal of keeping the project on track, on budget, and on time through scheduling and push pull activities.

Project completed: 2015

IMG_2409
IMG_2666

Posted on

Arizona Department of Administration Chiller and Cooling Tower

Role: Specialty Subcontractor.

Project Components: Structural Concrete Screen Walls, Structural Concrete Equipment Pads, Helical Piers, Structural Steel, Metal Framing, and Standing Seam Metal Roofing.

Main Challenge: Unknown underground utilities and working in the Down Town Phoenix Area.

Solution: Potholing, coordination with the project team, special engineering, and city traffic closure permitting.

Project completed: 2014

IMG_1670
IMG_1672
IMG_1705
IMG_1484
IMG_1684
IMG_1732
IMG_1488
IMG_1700

Posted on

Chandler Regional Medical Center Morrison Building Parking Lot Addition Project

Role: General Contractor

Project Components: Site grading, paving, landscaping, lighting, storm water retention, sidewalk, colored concrete, crosswalks, curb, gutter, and detectable warning systems

Subcontractors: ACE Asphalt, Swain Electric, Landscape Professionals

Main Challenge: Work directly in front of building in use

Solution: Courtesy, and careful redirection of vehicle and foot traffic

crp3
crp7